PANEL: Closing the Performance Gap: Design Intent to Verified Outcomes
The performance gap between designed and operational energy use remains stubbornly persistent. This closing panel brings together a designer, a contractor, an FM and a client to dissect why the gap persists despite better tools, guidance and verification regimes - and what each role can do differently. Anchored in CIBSE TM54 and Soft Landings.
Speakers